FREE sourcing support and up to 3% procurement support for qualified business buyers. Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.

Independent China fabric sourcing · specification-led inquiry · not sanderson

Revision workspace

SwatchTrail Procurement tracks construction, finish and development revisions

Use this log with a retained swatch, written specification and mill article number. It is a development tracker, not an environmental scorecard.

Keep development decisions visible

State the material question before choosing an option

Open choices usually sit in weave versus knit, pick density, GSM tolerance, usable width, backing, stain or soil finish, and whether color is yarn-dyed, piece-dyed or printed. Write the question in one sentence, such as whether a heavier construction is allowed if abrasion improves, or whether a substitute finish may change hand. Do not close the question by copying a decorative pattern name from a third-party brand search. The buyer verifies alternatives item by item: fiber blend, construction, weight, width, stretch, coating, backing, finish, minimum order and sample stage.

Compare evidence using the same reference

Each mill revision needs the same retained swatch identity, light source and measurement basis. If GSM moves, record the new value, tolerance and method. If finish chemistry changes, record whether abrasion, lightfastness or cleanability tests must be re-run on the finished article. Strike-offs do not replace bulk shade lots. Keep mill data sheets tied to the quoted article, date and laboratory. Unrelated ISO or OEKO-TEX files do not prove the current development cut.

Record the next decision in the RFQ message

Before sending an inquiry, list accepted revisions, rejected revisions and still-open fields. Include quantity, unit, US destination, the next sample stage and any optional budget with currency and basis. Note supplier preference as high-end, mid-range, budget or undecided. That log lets later quotations stay aligned with the development file instead of restarting from a brand label. Construction and finish tracking is a purchase control, not a claim of mill capacity or authorization.

Send the current revision pack

Share open specification choices and the evidence still required before an alternative is accepted.

Enter a contact name.
Enter a work email.
Describe the material brief before sending.

By sending this form you agree to the Privacy Policy. We review the brief; we do not promise stock, authorization or a fixed saving.